A
adrian marsh
- Thread starter
- #1
I have a quote to put together for the local branch of a large national company. There are multiple offices, corridors and a large boardroom to include in the quote.
How to do the job etc is not a problem, but, I have explained due to H&S considerations (far too many people wandering about) this job can/should only be done out of hours, which they are happy with. My question is:- as the job is to be out of hours would a full Coshh and Method Statement still be required or would an abbreviated version be sufficient along with Data Safety Sheets?
How to do the job etc is not a problem, but, I have explained due to H&S considerations (far too many people wandering about) this job can/should only be done out of hours, which they are happy with. My question is:- as the job is to be out of hours would a full Coshh and Method Statement still be required or would an abbreviated version be sufficient along with Data Safety Sheets?